| EMPLOYER: | R.o.T. GENERAL DIRECTORATE OF HIGHWAYS |
| PROJECT NAME: | (TORUL-GÜMÜŞHANE) SEPARATION - ŞİRAN ROAD REPAIR WORK |
| DESCRIPTION: | LEVELLING, ENGINEERING STRUCTURES BRIDGE, SUB-FOUNDATION, FOUNDATION AND SURFACE DRESSING CONSTRUCTION WORKS |
| COMPLETION DATE: | 19.03.2019 |